Oil & Gas
Stack Fabrication & Supply
2022
Supply, Fabrication, Erection of SS 316L Foam Tanks of 30 Cu Mtr x 2 Nos. Fabricated from SS 316L Plates along with Associated Structural, Piping & Pump Erection.
Oil & Gas
Boiler Maintenance
2022
Supply, Fabrication, Erection of Steel Staircase at M/s HPCL – MR I & MR II along with associated Civil Work
Oil & Gas
Piping
2021
Supply, Fabrication & Erection Stack, Cone Roof & Floor including Refractory Application & Pre Dry out of IOH Furnace F 401
Oil & Gas
Piping
2022
Supply & Manufacturing of Boiler Bank Tubes , Water Wall tubes, Rear Wall Tubes under IBR, Replacement of Tubes including welding of Fins.
Oil & Gas
2021
Replacement of Hydrogen Reformer Tubes – 59 Tubes of Hydrogen – 3 Unit – HALDOR TOPSOE DESIGN
Oil & Gas
2021
Pre Fabrication & Replacement of Utility Piping
Oil & Gas
2021
Pre Fabrication & Replacement of Offsite & Unit Piping including
Oil & Gas
2021
Pre TA Jobs at CCR & ISOM Unit in GFEC Block
- 3.8 Km Fabrication, Galvanising & Replacement in Field
- Fabrication & Replacement of Service Water & Plant Air Manifolds and associated piping in CCR & ISOM Unit
- Erection & Dismantling of Scaffolding , Blasting & Painting.
Oil & Gas
2021
Replacement of Hydrogen Reformer Tubes – 192 Nos Along with Cold Collector, Hot Outlet Collector of Hydrogen – 2 Unit – KTI DESIGN
Oil & Gas
2020
Replacement of Wasteheat Boiler of Hydrogen Reformer of Hydrogen – 1 Unit Including Supply of Refractory, Application & its Dry out. Weight of Equipment – 33 MT
Oil & Gas
2020
Supply Fabrication of 5 Nos of Stack Segments of SRU – 1 Including Internal SS 316L Thermal Spray Lining of Stack Segments.
Oil & Gas
2020
Supply Fabrication of 3 Nos of Stack Segments of SRU – 1 & SS – 316L Stack Rain Protection Canopy.
Oil & Gas
2019
Replacement of Catalyst Reformer Tubes in Hydrogen # 1 Unit – 12 Nos Tubes replaced in 4 Days.
Oil & Gas
2019
SEU I -TA
Jobs on Colums, Vessels , Heat Exchangers, Piping Fabrication, Loop Hydrotesting, Tanks, Structural Works & Valve Repair / Maintenace
Oil & Gas
IBR Job
2019
IBR Related Jobs on CAT Cooler of NFCCU unit
Oil & Gas
Heater/Furnace
2019
Supply, Fabrication & Replacement of SEU- I Furnace: Twin Cylindrical Radiant Section, Common Convection Section, Roof & Stack. Including Refractory Supply, Application & Dryout.
Oil & Gas
Piping
2018
Piping Job for H2 Line along with Civil Work. Job involved 1850 Meters of 10 “Dia Piping Fabrication & Erection, Erection & Dismantling of 38000 Cubic Meter of Scaffolding
Oil & Gas
Reformer
2018
Replacement of Outlet Pigtails of Reformer in Hydrogen#1 Unit.
Oil & Gas
Heater/Furnace
2018
Super Heater Coil replacement of SRU Incinerator of DHDS Block of 4″ SCH 40 SS 304 L tubes.
Oil & Gas
Heater/Furnace
2017
Super Heater Coil replacement of SRU Incenerator of DHDS Block of 4″ SCH 40 SS 304 L tubes.
Oil & Gas
2016
Fabrication & Replacement of SEU- III Furnace : Twin Cylindrical Radiant Section, Common Convection Section, Roof & Stack. Including Refractory Application & Dryout
Oil & Gas
Reactor Internals
2015
Supply Of Flat Floor ( Internals ) For Reactor R1 – DHDS.
Oil & Gas
2015
Heater Modification Works for RFU Revamp which involved replacement of Complete Burner Floor Plate of 3 Nos of Heaters
Oil & Gas
Composite Mechanical Work
2015
TA 2015 FRE: APS, VPS, Exchanger, Piping, Structural Main Contract.
Oil & Gas
Composite Mechanical Work
2015
FRE TA 2015: Turnaround jobs on Columns, Vessels & Miscellaneous Equipment of FRE APS & VPS Unit.
Oil & Gas
Composite Mechanical Work
2014
TA 2014 – Opening, Cleaning & repairs of Columns, Vessels in LR.
Oil & Gas
Piping
2013
EMERGENCY JOB : Service contract for replacement of Fire exposed piping & structurals in CDU / VDU.
Oil & Gas
Heavy Lifting & Rigging Job
2013
Shifting, replacement of Waste Heat Boiler (73E13) along with associated piping & hydrotest of HGU IBR Circuit MR – 12998, in HGU, DHDS Block, FR.
Oil & Gas
Composite Mechanical Work
2012
- Replacement of Catalyst reformer tubes of HGU
- Replacement / repairing of VDU Heater tubes during 2012
- Service Contract for replacement of fire exposed pipelines in HCU.
- Replacement of Thermocouples of 04-FF-002 & repairing of special PDT nozzle of 04-CC-001.
- Repairing of Gas Distributor of 16-CC-003 in MS Plant
Oil & Gas
Composite Mechanical Work
2012
Old FCCU Shutdown March 2012 – Misc. Jobs On Reactor Section, Old FCCU.
Oil & Gas
Boiler Maintenance
2012
Fabrication, Supply & Erection of Spirally Finned CPH Coils for HRSG – I & III, at CPP.
Oil & Gas
Composite Mechanical Work
2012
New FCCU Shutdown April 2012 – Misc. Jobs on Reactor Section, New FCCU.
Oil & Gas
Boiler Maintenance
2011
Replacement of Top 3 Meter section of Stack including Fabrication & Refractory Application
Oil & Gas
Heavy Lifting & Rigging Job
2011
- Hot Jobs on Thermal Oxidise Furnace.
- Replacement of Venturi Circulation Tank.
Oil & Gas
Reformer
2011
Emergency Service Contract for replacement of Reformer Tubes – 2 Nos.
Oil & Gas
Boiler Maintenance
2011
Supply, Fabrication & Installation of Spiral Finned Economiser Coils with both inlet & outlet stubs for HRSG -1 at CPP.
Oil & Gas
Composite Mechanical Work
2010
SHUTDOWN JOB :
- Hot jobs of special nature during DQUP shutdown.
- Replacement of Hydrogen Reformer Tubes.
- Reclamation jobs of critical nature during DQUP Shutdown.
Oil & Gas
Piping
2010
Fabrication & Erection of Carbon Steel , Stainless Steel , Alloy Steel & Cement Lined Piping during ATA – 2010
Oil & Gas
Modification
2010
FRE Desalter Internal Modification
Oil & Gas
Composite Mechanical Work
2010
Fabrication of CCU COB Bypass stack & CCU Regenerator cyclones.
Oil & Gas
Heater/Furnace
2010
FRE VPS Furnace ( 32-F-1) Convection Section Pre Fabrication Job.
Oil & Gas
Heavy Lifting & Rigging Job
2010
Rolling of Compressor at CS 09 & CS 01: Job Designing of Lifiting and pulling Jig Supply & Fabrication along with services for pulling
Oil & Gas
Modification
2009
FR Desalter Internal Modification